Newest to-do list

Probably far from comprehensive, but I wanted to get as much written down as possible:

  • Re-rig the masts in preparation for hoisting them
  • Review all safety equipment requirements (with an emphasis on equipment with expiration dates – fire extinguishers, flares, etc.)
  • Bottom paint (and reviewing old photos really makes me want to throw some of the copper-bronze on the leeboards)
  • Legalize the potty (including, perhaps, sealing the through-hull)
  • Obtain an Ohio boat sticker for 2009
  • Legalize the transom with some pretty lettering. Or at least legal lettering
  • Hang the leeboards (Sam said that he wants to be there for that)
  • If allowed, get the masts hoisted

There are other things that I could write down right now, but they can wait until the boat is launched. Or they can be done wherever they fit. Whatever; the list is the stuff I need to get done in order to dunk the Centennial.

Before-and-after Centennial

Leave a Reply